New Steel Poles
Utility Pole Solutions specializes in delivering steel transmission and distribution poles at dramatically-reduced lead times. We can engineer, fabricate, galvanize and ship most orders within 11-12 weeks. Our unique supply chain makes these lead times possible. Our engineering processes are streamlined and we have the expertise to assist you with determining your steel pole requirements. We have delivered custom structures in less time than it takes to process the paperwork in conventional systems.
The steel pole manufacturing facility boasts the standard in steel pole manufacturing equipment. The plant’s output capacity is 450,000 to 600,000lbs. per week. The highest quality standards are followed in all stages of production.



